Fab MESMy work

FAB-1 · 300 mm

Fab overview

Line health at a glance: WIP, moves, outs, cycle time, yield and equipment state.

WIP by area

Lots at each area's next step

Lots

Moves per hour

Wafer-steps completed, last 24 hours

Equipment state now

One segment per tool · SEMI E10

Equipment

Line profile · LGC-28 route

WIP at each operation; tall bars are where the line is queuing

RunningQueuedOn hold

Live activity

Lot, tool, SPC and user events, newest first

Lot tracking

Lots

Every lot in the line: where it is, what it waits for and whether it will make its due date.

What next

Dispatch

Each tool's queue in the order the dispatcher recommends. Q-time-critical lots jump ahead; CR is the critical ratio (below 1.0 means the lot is behind its due date).

Tool status

Equipment

Every tool's SEMI E10 state, what it is running, its last 24 hours and its PM counter.

Keep tools up

Maintenance

Preventive maintenance counters, work orders and repair times.

PM schedule

Wafer counters, most due first

Mean time to repair

Closed repair work orders by area

Work orders

Open first, then most recent

Alarm management

Alarms

Equipment faults, SPC signals, Q-time violations and yield alerts. Acknowledge, then clear.

Statistical process control

SPC

Inline measurements against control and spec limits, colored by the tool that ran the step. A rule 1 violation holds the lot and inhibits the tool (out-of-control action plan).

Control chart

Last 80 lots measured

Parameter

  • Rule 1 one point beyond ±3σ: hold + inhibit
  • Rule 2 2 of 3 points beyond 2σ, same side
  • Rule 4 8 points in a row on one side

Capability by tool

Same parameter, each responsible tool

Recent signals

All parameters

Yield analysis

Yield

Probe yield by lot, fail-bin Pareto, wafer maps and tool commonality: which tool did the low-yield lots share?

Probe yield by lot

Last 7 days, one point per lot

Fail bin Pareto

Share of all dies tested

Wafer map

Pick a lot, then a wafer. Lowest-yield wafer opens first.

Low-yield lots

8+ points below product baseline

Tool commonality

Mean probe yield of lots that ran a step on each tool, against the same step on the other tools. Worst first.

Quality

Holds

Lots stopped by SPC, equipment aborts, Q-time violations, inspections or people. Disposition them here.

By category

Lots on hold now

How it works

About this MES

A simulation. FAB-1, its tools, products, people and numbers are fictional; the model is simplified but follows how a real fab MES works.

The Fab MES Simulator is a working manufacturing execution system for FAB-1, a fictional 300 mm fab. Lots move through re-entrant logic and power routes, tools fail and get repaired, metrology steps feed SPC charts, and probe turns tool wear into die yield and wafer maps. All of it runs live in your browser.

Pick a persona in the top bar and the app changes with you. An operator loads the next lot onto their tools. A technician answers alarms and runs PMs. A process engineer dispositions holds and releases inhibited tools. A yield engineer traces a low-yield excursion back to the tool that caused it. A shift manager watches WIP, moves and due dates. Each persona can only do what that role can do in a real fab.

What is simulated

  • 29 tools in 9 areas, three products on two re-entrant routes (31 and 19 operations), about 55 lots in the line.
  • Tools fail at random (more often when worn), get repaired, qualified and released; PMs run on wafer counters.
  • Metrology steps produce SPC points. Worn tools drift; Western Electric rules hold lots and inhibit tools.
  • Each worn tool leaves a signature on the lots it runs: edge ring from etch, center loss from film and implant, repeaters from litho, scratches from CMP. Probe turns it into die yield and wafer maps.
  • ETCH-03 is the fab's problem tool: its chamber wears about three times faster than its siblings.
  • The autopilot crew does routine work so the fab keeps moving. Switch it off in the status bar to run everything yourself.

Personas

Switch in the top bar. Actions another role owns are locked and say who can do them.

  • Runs lots: picks the next lot from the dispatch list, tracks it in and out, reports tool problems.

  • Keeps tools up: answers alarms, repairs and qualifies tools, runs preventive maintenance.

  • Owns process control: watches SPC, dispositions held lots, inhibits drifting tools, splits lots.

  • Finds yield loss: reads wafer maps and bin Paretos, runs tool commonality to find the cause.

  • Runs the shift: watches WIP, moves and outs, sets lot priority, starts new lots, clears bottlenecks.

Equipment states (SEMI E10)

  • ProductiveProcessing production lots
  • StandbyUp and available, waiting for work
  • EngineeringQualification, inhibit or engineering runs
  • Scheduled downPreventive maintenance
  • Unscheduled downFailure or alarm, waiting for repair
  • Non-scheduledNot scheduled for production

Glossary

MES
Manufacturing execution system: the software that tracks every lot, tool and step in the fab and enforces the rules.
Lot
A FOUP of up to 25 wafers that travels the route together. Lots can be split; the child keeps the parent history (genealogy).
Route / operation
The ordered list of process steps for a product. Logic routes are re-entrant: lots visit litho and etch many times.
Track in / track out
Starting and finishing a lot on a tool. The MES checks the tool is qualified for the step and records the recipe.
Dispatching
Choosing which queued lot a free tool runs next, here by priority and critical ratio.
Critical ratio (CR)
Time left until the due date divided by the work left. Below 1.0 the lot is behind.
Q-time
A maximum wait between two steps (for example clean to oxidation) before native oxide or contamination ruins the wafer.
SEMI E10
The industry standard for equipment states: productive, standby, engineering, scheduled down, unscheduled down, non-scheduled.
SPC / OCAP
Statistical process control charts and the out-of-control action plan they trigger: hold the lot, inhibit the tool.
Cpk
Process capability: how many 3σ fit between the mean and the nearest spec limit. 1.33 is a common target.
Commonality
Yield analysis that asks which tool, chamber or step the bad lots had in common.
X-factor
Cycle time divided by raw process time: how much of a lot’s life is spent waiting.

Details

Action

↑ ↓ to move · Enter to open · Esc to close

Starting FAB-1

Loading tools, routes and lots