WFE Intelligence HubOverview

Wafer fab equipment

WFE Intelligence Hub

Market, segments, vendors, fab projects, technology roadmap and policy for the roughly $104B wafer fab equipment industry, in one place.

WFE spend 2024

$104B

+8% vs 2023

2026 estimate

$118B

+7% vs 2025E

China share of spend

42%

Largest region, 2024

Fab projects tracked

29

20 building or ramping

Indicative figures compiled from public sources and rounded. Market values for 2025 and 2026 are estimates. Verify against the primary source before citing. Sources

WFE spend by year

USD billions · hatched bars are estimates

Market

Where tools ship

Equipment billings by region, 2024, USD billions

China$50B
South Korea$21B
Taiwan$17B
North America$14B
Japan$7.8B
Europe$4.9B
Rest of world$4.0B

Spend by device

Share of 2024 WFE

Foundry & logic 58%DRAM 24%NAND 10%Specialty & other 8%
  • AI accelerators pull leading-edge logic

    GAA nanosheet ramps at 2 nm-class nodes and backside power delivery add deposition, etch and metrology steps per wafer.

  • HBM is the fastest-growing DRAM demand

    HBM stacks use roughly three times the wafer area of standard DRAM per bit, and add TSV, thinning and bonding tools.

Key signals

Signal 1

AI accelerators pull leading-edge logic

GAA nanosheet ramps at 2 nm-class nodes and backside power delivery add deposition, etch and metrology steps per wafer.

Signal 2

HBM is the fastest-growing DRAM demand

HBM stacks use roughly three times the wafer area of standard DRAM per bit, and add TSV, thinning and bonding tools.

Signal 3

China spend is normalizing from a peak

Mature-node capacity builds kept China the largest region since 2020. Export controls and digestion moderate growth.

Signal 4

Memory capex recovers unevenly

DRAM capex is led by HBM and 1c-node conversions. NAND spend stays focused on layer-count upgrades over new capacity.

Semiconductor Manufacturing Process Presence Map

Interactive mapping of WFE vendor dominance across the semiconductor manufacturing value chain.

Dominant (>40% share)
Strong (20–40%)
Moderate (10–20%)
Present (<10%)

Semiconductor Manufacturing Process Value Chain

Front-End Wafer Fabrication Flow

🔩
Wafer Prep & Epitaxy
Crystal growth, epi layers
ASMIAMATTEL
→
🔥
Oxidation & Diffusion
Thermal processing
TELKokusaiASMIAMAT
→
🔬
Lithography
Pattern exposure & coat/develop
ASMLTELSCREEN
→
⚡
Etching
Plasma etch, ALE, RIE
LAMTELAMATHitachi HT
→
🧪
Deposition
CVD, PVD, ALD, ECD
AMATASMILAMTELKokusai
→
💠
Ion Implantation
Doping & modification
AMATAxcelis
→
💎
CMP
Planarization
AMATEbara
→
🫧
Cleaning
Wet clean, strip, surface prep
SCREENTELLAMAMAT
→
📦
Adv. Packaging
Bonding, TSV, RDL
AMATLAMTELKLA
⤵ Cross-Process & Inline Steps (used across all stages)
🔎 Metrology & Inspection
CD-SEM, overlay, film, defect inspection — inline & offline
KLAAMATHitachi HTASMLOnto
🎭 Photomask / Reticle
Mask writing, inspection, repair — supports lithography
KLAAMATLasertecNuFlare
🌡️ Rapid Thermal Processing
Annealing, activation — used after implant & deposition
AMATSCREENTEL
📐 Wafer Test / Probing
Electrical test, wafer probers — end-of-line verification
TELFormFactor

Vendor × Process Presence Heatmap

Dominance mapping across semiconductor manufacturing processes

VendorLithoCoat/DevEtchCVDPVDALDEpitaxyIon Impl.CMPCleanMetrologyPhotomaskAdv. PkgRTPWafer Test
ASML■■■■—————————■————
AMAT——■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■—
KLA——————————■■■■■■■■■■——
LAM——■■■■■■■—■■———■■■■—■■■——
TEL—■■■■■■■■■■■■■■——■■■——■■■■■■■■
ASMI———■■—■■■■■■■■————————
SCREEN—■———————■■■■■——■■—
Kokusai Electric———■■—■■—————————
Hitachi High-Tech——■■———————■■————

Critical Chokepoints

Single-vendor dominant processes

EUV / High-NA Lithography
ASML holds 100% monopoly on EUV scanners. No alternative supplier exists. Every sub-5nm chip requires ASML systems.
ASML ~100%
Coater / Developer (Tracks)
TEL commands ~92% of the global coater/developer market and ~100% of EUV track systems. Every wafer exposed on ASML EUV must pass through TEL tracks.
TEL ~92%
Single-Wafer ALD
ASM International holds >55% share in single-wafer ALD, critical for high-k/metal gate, GAA transistors and advanced patterning at sub-3nm nodes.
ASMI ~55%
Process Control & Inspection
KLA dominates patterned wafer inspection, CD-SEM, overlay metrology, and reticle inspection with >50% share in process control overall.
KLA ~55%

Market

Size, cycle and mix

WFE grew from $37B in 2016 to $104B in 2024, a 13.8% compound annual growth rate, as AI, cloud and localization lifted capex across every device type.

CAGR 2016–2024

13.8%

On actual spend

Strongest year

2021

+44% YoY

Weakest year

2019

−4% YoY

Regions over $10B

4

of 7 tracked

Global WFE spend

USD billions, year-on-year change under each year · hatched bars are estimates

View as table
YearWFE (USD B)YoYBasis
201637—Actual (approx.)
201750+35%Actual (approx.)
201854+8%Actual (approx.)
201952−4%Actual (approx.)
202061+17%Actual (approx.)
202188+44%Actual (approx.)
202294+7%Actual (approx.)
202396+2%Actual (approx.)
2024104+8%Actual (approx.)
2025110+6%Estimate
2026118+7%Estimate

Billings by region, 2024

Where equipment ships, USD billions

China$50B
South Korea$21B
Taiwan$17B
North America$14B
Japan$7.8B
Europe$4.9B
Rest of world$4.0B
View as table
RegionUSD BShare
China49.642.4%
South Korea20.517.5%
Taiwan16.614.2%
North America13.711.7%
Japan7.86.7%
Europe4.94.2%
Rest of world4.03.4%

Spend by device, 2024

Share of WFE

Foundry & logic 58%DRAM 24%NAND 10%Specialty & other 8%
Foundry & logic58%
DRAM24%
NAND10%
Specialty & other8%

What drives the cycle

AI accelerators pull leading-edge logic

GAA nanosheet ramps at 2 nm-class nodes and backside power delivery add deposition, etch and metrology steps per wafer.

HBM is the fastest-growing DRAM demand

HBM stacks use roughly three times the wafer area of standard DRAM per bit, and add TSV, thinning and bonding tools.

China spend is normalizing from a peak

Mature-node capacity builds kept China the largest region since 2020. Export controls and digestion moderate growth.

Memory capex recovers unevenly

DRAM capex is led by HBM and 1c-node conversions. NAND spend stays focused on layer-count upgrades over new capacity.

Segments

Where the money goes

Lithography, etch and deposition take about 68% of WFE. Sizes below apply each share to 2024 spend of $104B.

Lithography

24% · ≈ $25B

Prints the circuit pattern. EUV scanners are the most expensive tools in the fab, and ASML is the only supplier.

Leaders

NikonCanon

Sub-segments

  • EUV scanners (0.33 NA, High-NA 0.55)
  • DUV immersion (ArFi)
  • Dry ArF, KrF, i-line
  • Coater / developer tracks
  • Mask writers

Growth drivers

  • High-NA EUV insertion at 14A-class logic and later DRAM
  • More EUV layers per node
  • DUV demand for mature-node China builds

Etch

22% · ≈ $23B

Removes material to transfer the pattern. Conductor and dielectric etch are both critical for 3D structures.

Leaders

Hitachi High-Tech

Sub-segments

  • Conductor etch
  • Dielectric etch
  • High-aspect-ratio and cryogenic etch
  • Atomic layer etch (ALE)
  • Selective / isotropic etch

Growth drivers

  • 3D NAND channel holes beyond 300 layers
  • GAA nanosheet release etch
  • Patterning steps as multi-patterning persists

Deposition

22% · ≈ $23B

Adds thin films: CVD, ALD, PVD, epitaxy and electroplating. It is the broadest segment by tool count.

Leaders

Sub-segments

  • CVD (PECVD, LPCVD)
  • ALD
  • PVD (sputter)
  • Epitaxy
  • Electrochemical deposition (ECD)
  • Metal CVD (W, Mo)

Growth drivers

  • GAA Si/SiGe superlattice epitaxy
  • Molybdenum replacing tungsten
  • Backside power and new interconnect metals

Process control

12% · ≈ $12B

Inspects and measures wafers and masks to find defects and keep critical dimensions and overlay in spec.

Leaders

Hitachi High-TechLasertec

Sub-segments

  • Wafer defect inspection
  • Reticle / mask inspection
  • Optical CD and film metrology
  • Overlay metrology
  • E-beam review and inspection

Growth drivers

  • More inspection steps per layer at GAA
  • EUV mask and pellicle inspection
  • Advanced packaging metrology

Thermal & other

8% · ≈ $8.3B

Furnaces, rapid thermal processing, annealing, and wafer bonding or other tools not covered above.

Leaders

MattsonEV Group

Sub-segments

  • Batch furnaces
  • Rapid thermal processing (RTP)
  • Laser anneal
  • Wafer bonding
  • Wafer handling & automation

Growth drivers

  • Hybrid and fusion bonding for HBM and backside power
  • Low-thermal-budget anneals for new materials

Clean

6% · ≈ $6.2B

Removes particles, residues and contamination between process steps. About one step in five is a clean.

Leaders

SEMES

Sub-segments

  • Single-wafer wet clean
  • Batch wet stations
  • Scrubbers
  • Dry / plasma clean

Growth drivers

  • Fragile 3D structures need gentler cleans
  • More clean steps at each new node
  • China localization

CMP

3% · ≈ $3.1B

Chemical mechanical planarization makes surfaces flat between layers and enables damascene copper lines.

Leaders

Ebara

Sub-segments

  • Dielectric CMP
  • Metal (Cu, W, Co) CMP
  • Post-CMP clean

Growth drivers

  • Hybrid bonding needs very flat surfaces
  • Backside wafer thinning and planarization

Ion implant

3% · ≈ $3.1B

Implants dopant ions to set the electrical properties of transistors and wells.

Leaders

Sumitomo Heavy (SMIT)

Sub-segments

  • High-current
  • Medium-current
  • High-energy
  • SiC / power implant

Growth drivers

  • SiC and power devices
  • Image sensors need high-energy implant
  • Mature-node capacity in China

Vendors

Who supplies the fabs

The top five, ASML, Applied Materials, Tokyo Electron, Lam Research, KLA, together report about $99B in revenue (including services). Chinese vendors are growing fastest from a smaller base.

Revenue, latest fiscal year

USD billions, approx. · includes services and non-WFE products · select a vendor for details

View as table
VendorFiscal yearRevenue (USD B)China
ASMLFY202430.636%
Applied MaterialsFY202427.237%
Tokyo ElectronFY2024 (Mar-25)16.0—
Lam ResearchFY2024 (Jun-24)14.942%
KLAFY2024 (Jun-24)9.843%
SCREEN HoldingsFY2024 (Mar-25)4.1—
NAURAFY20244.1—
ASM InternationalFY20243.2—
Kokusai ElectricFY2024 (Mar-25)1.6—
AMECFY20241.3—
AxcelisFY20241.0—
Onto InnovationFY20241.0—
ACM ResearchFY20240.8—
NovaFY20240.7—

14 vendors

Fab tracker

New capacity around the world

Major greenfield fabs and expansions that will absorb equipment over the next five years. Status and timing reflect public announcements and change often.

Projects by region

Number of tracked fab projects

US11
Japan5
Korea3
SE Asia3
Taiwan2
Europe2
India2
China1

Projects by type

Number of tracked fab projects

Foundry13
DRAM6
Packaging3
Logic3
Specialty3
NAND1

29 projects

CompanySiteRegionTypeNode / productStatusFirst outputInvestment
TSMCArizona Fab 21 P1, PhoenixUSFoundryN4Operating2025$165B (all Arizona phases)
TSMCArizona Fab 21 P2, PhoenixUSFoundryN3Construction2027—
TSMCArizona Fab 21 P3, PhoenixUSFoundryN2 / A16Construction2028+—
TSMCFab 20, Hsinchu (Baoshan)TaiwanFoundryN2Ramping2025—
TSMCFab 22, KaohsiungTaiwanFoundryN2 / A16Ramping2025—
JASM (TSMC)Fab 1, KumamotoJapanFoundry12–28 nmOperating2024~$20B (Fab 1 + 2)
JASM (TSMC)Fab 2, KumamotoJapanFoundry6–7 nmConstruction2027+—
ESMC (TSMC JV)DresdenEuropeFoundry12–28 nmConstruction2027~€10B
SamsungTaylor, TexasUSFoundry2 nmConstruction2026~$37B (Texas program)
SamsungPyeongtaek P4KoreaDRAM1c DRAMRamping2025—
SK hynixM15X, CheongjuKoreaDRAMHBM DRAMRamping2025—
SK hynixYongin cluster, Fab 1KoreaDRAMDRAM / HBMConstruction2027—
SK hynixWest Lafayette, IndianaUSPackagingHBM packagingPlanned2028~$3.9B
MicronID1, BoiseUSDRAMLeading-edge DRAMConstruction2027—
MicronClay, New YorkUSDRAMLeading-edge DRAMPlanned2030+Up to $100B (long term)
MicronHiroshimaJapanDRAM1γ DRAM (EUV)Ramping2025—
MicronSingapore HBM assemblySE AsiaPackagingHBM packagingConstruction2026–27—
MicronSanand, GujaratIndiaPackagingAssembly & testConstruction2025–26—
IntelFab 52, ChandlerUSLogicIntel 18ARamping2025—
IntelOhio One, New AlbanyUSLogicIntel 14A-classDelayed2030+$28B (initial)
IntelFab 29, MagdeburgEuropeLogicLeading-edgeCancelled—~€30B (withdrawn)
RapidusIIM-1, ChitoseJapanFoundry2 nmPilot2027 (volume)—
Tata Electronics (PSMC tech)Dholera, GujaratIndiaFoundry28–110 nmConstruction2026–27~$11B
Texas InstrumentsSM1, ShermanUSSpecialty300 mm analogOperating2025—
GlobalFoundriesFab 8 expansion, MaltaUSSpecialty12–22 nm FDX / FinFETPlanned2027+—
Hua HongFab 9, WuxiChinaSpecialty40–90 nmRamping2025—
UMCFab 12i P3, SingaporeSE AsiaFoundry22–28 nmOperating2025—
VSMC (Vanguard–NXP)SingaporeSE AsiaFoundry40–130 nmConstruction2027~$7.8B
Kioxia / SandiskKitakami K2JapanNANDBiCS 3D NANDRamping2025—

Technology roadmap

Inflections that move WFE

Each new device architecture changes which tools a fab buys. The chips under each milestone show the segments that gain the most.

2025

Logic

TSMC N2: first GAA nanosheet node at TSMC

Nanosheet transistors add Si/SiGe epitaxy stacks, selective etch to release the channels, and more ALD for the inner spacers.

DRAM

1c (sixth-generation 10 nm-class) DRAM

More EUV layers per wafer. Production goes first to HBM4 base and core dies.

NAND

300+ layer 3D NAND

Layer-count upgrades push high-aspect-ratio and cryogenic etch, and molybdenum word lines.

Lithography

High-NA EUV moves into R&D and pilot lines

EXE:5000 tools at Intel, imec and memory makers. EXE:5200 adds productivity for HVM.

2026

Logic

TSMC A16 with Super Power Rail

Backside power reaches foundry. It adds wafer bonding, thinning and backside contact formation.

2027

Packaging

Hybrid bonding for HBM4E and SoIC

Cu-Cu direct bonding replaces micro-bumps at fine pitch and needs very flat CMP and very clean surfaces.

Lithography

High-NA EUV in high-volume manufacturing

First HVM insertion is expected at 14A-class logic. It cuts multi-patterning steps on critical layers.

BenefitsLithography

2028

Packaging

Panel-level packaging and glass substrates

Larger formats make room for AI packages with more chiplets and HBM stacks.

2030+

DRAM

4F² vertical-channel and 3D DRAM

Vertical transistors, then stacked DRAM cells, shift DRAM spending from lithography toward deposition and etch, as happened in NAND.

2032+

Logic

CFET (complementary FET)

Stacked n- and p-type transistors add sequential integration steps and more bonding.

Policy

Export controls and subsidies

Governments now shape where fabs are built and which tools can ship where. Newest first.

2025

Export controlUSSep 2025

BIS 50% affiliates rule

Extends Entity List restrictions to majority-owned subsidiaries. It was later suspended for one year under a US–China trade arrangement.

Industrial policyUSAug 2025

US government takes an equity stake in Intel

CHIPS grants are converted into a roughly 10% stake.

Export controlUSAug 2025

VEU status revoked for Samsung and SK hynix China fabs

Tool shipments to their China fabs now need individual licences.

SubsidyKoreaMar 2025

Expanded K-Chips Act tax credits

Higher investment tax credits for national strategic technology facilities.

2024

Export controlUSDec 2024

BIS December 2024 rules

Adds 24 tool types, 3 software tools, HBM controls and about 140 entities, and extends the foreign direct product rules.

SubsidyJapanNov 2024

¥10T AI and semiconductor package

Multi-year support for Rapidus, JASM and AI infrastructure through 2030.

Industrial policyChinaMay 2024

Big Fund III launched

A national IC fund of about ¥344B (≈ $47B) that targets equipment, materials and HBM.

2023

Export controlUSOct 2023

BIS update to the October 2022 rules

Widens the equipment scope, closes loopholes and adds more destination countries.

Export controlNetherlandsSep 2023

Dutch licences for advanced DUV

Licences are required for the most advanced immersion DUV systems. EUV was already restricted.

SubsidyEUSep 2023

EU Chips Act enters into force

Targets €43B of public and private investment and 20% of global production by 2030.

Export controlJapanJul 2023

Japan controls 23 equipment categories

Covers lithography, etch, deposition and cleaning tools for advanced nodes.

2022

Export controlUSOct 2022

BIS advanced computing and semiconductor rules

Restricts exports of tools for advanced logic, DRAM and NAND fabs in China, and limits support from US persons.

SubsidyUSAug 2022

CHIPS and Science Act signed

$52.7B in total, including $39B in manufacturing incentives and a 25% investment tax credit for fab equipment.

2021

SubsidyIndiaDec 2021

India Semiconductor Mission

An incentive program of about $10B for fabs, display and assembly / test plants.

Process explorer

From bare wafer to finished die

The main front-end process modules, the tools each one uses and who makes them. A modern logic flow repeats these loops hundreds of times.

  1. Oxidation & thermal

    Grow oxides, anneal implants and densify films.

    Vertical batch furnace

    Rapid thermal / laser anneal

    MattsonSCREEN
    At the leading edge: New channel materials and backside power need low-thermal-budget anneals.
    Thermal & other segment
  2. Thin-film deposition

    Deposit dielectric, metal and semiconductor films, from single atomic layers to microns thick.

    PECVD / LPCVD

    ALD

    PVD

    Epitaxy

    Electroplating (ECD)

    At the leading edge: GAA superlattices, inner spacers and Mo/Ru metals all need atomic-scale control.
    Deposition segment
  3. Lithography

    Coat photoresist, expose the pattern through a mask, and develop it.

    EUV scanner

    DUV immersion scanner

    Nikon

    KrF / i-line steppers

    CanonNikon

    Coater / developer track

    At the leading edge: High-NA EUV trades smaller exposure fields for resolution. Stochastic defects push inspection demand.
    Lithography segment
  4. Etch

    Remove material selectively to transfer the resist pattern into the films below.

    Conductor etch (ICP)

    Hitachi High-Tech

    Dielectric etch (CCP)

    Cryogenic / HAR etch

    Selective isotropic etch

    At the leading edge: NAND channel holes exceed 50:1 aspect ratio, and GAA release etch must remove SiGe without attacking Si.
    Etch segment
  5. Ion implant

    Dope silicon to form wells, sources/drains and junctions.

    High / medium current implant

    Sumitomo Heavy (SMIT)

    High-energy implant

    At the leading edge: Image sensors and SiC power devices drive high-energy and high-temperature implant.
    Ion implant segment
  6. CMP

    Planarize the wafer surface between layers and remove excess metal.

    CMP polisher with integrated clean

    Ebara
    At the leading edge: Hybrid bonding needs nanometre-level flatness across the whole wafer.
    CMP segment
  7. Wet & dry clean

    Remove particles, residues and metals between steps.

    Single-wafer wet clean

    SEMES

    Batch wet bench

    At the leading edge: Tall, fragile 3D features collapse under surface tension, so cleans move to new drying methods.
    Clean segment
  8. Metrology & inspection

    Measure CD, overlay and film thickness, and find killer defects on wafers and masks.

    Optical wafer inspection

    E-beam inspection / review

    Hitachi High-Tech

    Overlay & OCD metrology

    Mask / reticle inspection

    Lasertec
    At the leading edge: Buried 3D structures can’t be seen from the top, which drives X-ray, e-beam and machine-learning metrology.
    Process control segment
  9. Advanced packaging

    Connect dies with TSVs, micro-bumps, hybrid bonds and interposers.

    Wafer bonders (hybrid / fusion)

    EV Group

    Grinding / thinning

    Disco

    Packaging lithography & inspection

    Canon
    At the leading edge: AI packages such as CoWoS and HBM shift spending toward front-end-class tools in the back end.
    Thermal & other segment

Glossary

20 terms used across the hub

WFE
Wafer fab equipment: the tools used in front-end wafer processing. Excludes test, assembly and fab facilities.
EUV
Extreme ultraviolet lithography at 13.5 nm wavelength. It replaces multiple DUV patterning steps on critical layers.
High-NA EUV
EUV with 0.55 numerical aperture, for about 8 nm resolution. ASML’s EXE platform.
DUV / ArFi
Deep ultraviolet (193 nm) immersion lithography, the workhorse for most layers.
GAA
Gate-all-around transistor (nanosheet or RibbonFET). The gate wraps the channel on all sides.
BSPDN
Backside power delivery network. Moves power lines under the transistors, as in PowerVia and Super Power Rail.
HBM
High-bandwidth memory: DRAM dies stacked with TSVs next to an accelerator.
ALD
Atomic layer deposition: self-limiting deposition of a film one atomic layer at a time.
ALE
Atomic layer etch: the etch counterpart of ALD, removing material layer by layer.
CMP
Chemical mechanical planarization: polishing the wafer flat with slurry and pads.
CD
Critical dimension: the width of the smallest feature, measured by CD-SEM or OCD.
Overlay
How well one layer’s pattern aligns to the layer below, measured in nanometres.
Hybrid bonding
Direct copper-to-copper and oxide-to-oxide bonding of dies or wafers, without solder bumps.
CoWoS
TSMC’s Chip-on-Wafer-on-Substrate 2.5D packaging, used for most AI accelerators.
TSV
Through-silicon via: a vertical electrical connection through a thinned die.
WSPM
Wafer starts per month: the usual unit of fab capacity.
Capital intensity
Capex as a share of revenue. Usually 25–35% for leading-edge chipmakers.
Book-to-bill
Orders divided by shipments. Above 1 means demand is growing.
VEU
Validated end user: a US export authorization that lets approved fabs receive controlled items without individual licences.
FDPR
Foreign direct product rule: extends US controls to foreign-made items built with US technology.

About

About this hub

Dataset last reviewed November 2026.

The WFE Intelligence Hub brings together the information you need to understand the wafer fab equipment industry: how big it is, where the spending goes, who supplies the tools, which fabs are being built, and which technology changes and policies will shift demand next.

It is built for semiconductor manufacturing, equipment and strategy professionals who want one place to orient themselves before going to the primary sources. Every view is generated from one dataset, so the charts, tables and search always agree.

Methodology

  • WFE means front-end wafer processing equipment. Test, assembly and fab facilities are excluded unless noted.
  • Regional figures are total semiconductor equipment billings by where tools ship, so they sum to more than WFE.
  • Vendor revenue is the latest full fiscal year, including services, converted to USD at period-average rates.
  • Segment sizes apply approximate shares to the latest actual WFE total.
  • Fab status and timing follow company announcements and change often.
Indicative figures compiled from public sources and rounded. Market values for 2025 and 2026 are estimates. Verify against the primary source before citing.

Data for AI assistants and developers

The whole dataset behind this hub is published in machine-readable form. Figures are the same approximations shown here, so the same caveats apply.

Use it like an app

On a phone, open your browser’s share or menu button and choose Add to Home Screen. The hub opens full screen, without browser chrome. Press / or ⌘K anywhere to search.

Vendor

↑ ↓ to move · Enter to open · Esc to close